当前位置: 网站首页 > 总站 > ISO9001认证 >
GB/T 50430-2007质量管理标准:质量管理基本要求 发布时间: 2011-10-25 16:42 点击:
GB/T 50430-2007质量管理标准:质量管理基本要求
GB / T 50430-2007 quality management standard: basic quality management requirements
3.1 一般规定
3.1 general provisions
3.1.1        施工企业应结合自身特点和质量管理需要,建立质量管理体系并形成文件。
3.1.1 construction enterprise should combine oneself characteristic and quality management needs, the establishment of quality management system document.
3.1.2        施工企业应对质量管理体系中的各项活动进行策划。
3.1.2 construction enterprises to deal with the quality management system in the various activities in the planning.
3.1.3        施工企业应检查、分析、改进质量管理活动的过程和结果。
3.1.3 construction enterprise should check, analysis, improvement of quality management activities of the process and results.
3.2  质量方针和质量目标
3.2 the quality policy and quality objectives
3.2.1        施工企业应制定质量方针。质量方针应与施工企业的经营管理方针相适应,体现施工企业的质量管理宗旨和方向。包括:
3.2.1 construction enterprise shall establish the quality policy. Quality policy and management of the construction enterprises adapt to the construction principle, embodiment of enterprise quality management objectives and direction. Include.
1       遵守国家法律、法规,满足合同约定的质量要求;
1 abide by the state laws, regulations, the contract to meet the prescribed quality requirements;
2       在工程施工过程中及交工后,认真服务于发包方和社会,增强其满意程度,树立施工企业在市场中的良好形象;
2 in the process of construction and the project was completed, to serve the party and society, enhance their satisfaction degree, to establish construction enterprises in the market in a good image;
3       追求质量管理改进,提高质量管理水平。
3 pursuit of quality improvement, improve the quality management level.
3.2.2        施工企业的最高管理者应对质量方针进行定期评审并作必要的修订。
3.2.2 construction enterprise top management shall periodically review the quality policy and making the necessary amendments.
3.2.3        施工企业应根据质量方针制定质量目标,明确质量管理和工程质量应达到的水平。
3.2.3 construction enterprise should according to the quality policy quality objectives, quality of clear project quality management and the level that should reach.
3.2.4        施工企业应建立并实施质量目标管理制度。
3.2.4 construction enterprise shall establish and implement quality management system.
3.3  质量管理体系的策划和建立
3.3 quality management system planning and building
3.3.1        最高管理者应对质量管理体系进行策划。策划的内容应包括:
3.3.1 top management to quality management system planning. Planning should include:
1        质量管理活动、相互关系及活动顺序;
1 quality management activities, the relationship and the sequence of activities;
2        质量管理组织机构;
2 quality management organization;
3        质量管理制度;
3 quality management system;
4        质量管理所需的资源。
4 quality management resources required.
3.3.2        施工企业应根据质量管理体系的范围确定质量管理内容。施工企业质量管理内容一般包括:
3.3.2 construction enterprise should according to the scope of the quality management system to determine the content of quality management. Construction enterprise quality management contents generally include:
1        质量方针和目标管理;
1 quality policy and objective management;
2        组织机构和职责;
2 organizational structure and responsibilities;
3        从略资源管理;
The 3 omitted resource management;
4        施工机具管理;
4 construction machinery management;
5        投标及合同管理;
5 bidding and contract management;
6        建筑材料、构配件和设备管理;
The 6 building materials, components and equipment management;
7        分包管理;
7 subcontractor management;
8        工程项目施工质量管理;
The 8 construction project quality management;
9        施工质量检查与验收;