当前位置: 网站首页 > 总站 > ISO9001认证 >
GB/T 50430-2007质量管理标准:11 施工质量检查与验收 发布时间: 2011-10-25 17:18 点击:

 

GB/T 50430-2007质量管理标准:11  施工质量检查与验收
GB / T 50430-2007: 11 quality management standard for construction quality inspection and acceptance
11.1  一般规定
11.1 general provisions
11.1.1    施工企业应建立并实施施工质量检查制度。施工企业应规定各管理层次对施工质量检查与验收活动进行监督管理的职责和权限。检查和验收活动应由具备相应资格的人员实施。施工企业应按规定做好对分包工程的质量检查和验收工作。
11.1.1 construction enterprise shall establish and implement the construction quality inspection system. The construction enterprise should stipulates the management level for construction quality inspection and acceptance activities carried out supervision and management responsibilities and authority. Inspection and acceptance activities by the qualified personnel. The construction enterprise shall do a good job subcontracting engineering quality check and acceptance work.
11.1.2    施工企业应配备和管理施工质量检查所需的各类检测设备。
11.1.2 construction enterprises should be equipped with and manage the construction quality inspection for all types of detection equipment.
11.2  施工质量检查
11.2 construction quality inspection
11.2.1    施工企业应对施工质量检查进行策划,包括质量检查的依据、内容、人员、时机、方法和记录。策划结果应按规定经批准后实施。
11.2.1 construction enterprises to deal with the construction quality inspection planning, including quality inspection basis, content, personnel, time, method and recording. The planning results shall be approved after implementation.
11.2.2    施工企业对质量检查记录的管理应符合相关制度的规定。
11.2.2 construction enterprise to quality inspection records management should be consistent with the relevant provisions of the.
11.2.3    项目经理部应根据策划的安排和施工质量验收标准实施检查。
11.2.3 project manager should be based on the planning arrangement and acceptance standard for construction quality inspection.
11.2.4    施工企业应对项目经理部的质量检查活动进行监控。
11.2.4 construction enterprises to deal with project manager for the Department of quality inspection monitoring activities.
11.3  施工质量验收
11.3 construction quality acceptance
11.3.1    施工企业应按规定策划并实施施工质量验收。施工企业应建立试验、检测管理制度。
11.3.1 construction enterprise shall plan and implement the construction quality acceptance. The construction enterprises should establish a test, inspection management system.
11.3.2    施工企业应在竣工验收前,进行内部验收,并按规定参加工程竣工验收。
11.3.2 construction company should be in before final acceptance, internal inspection, in accordance with the provisions in the completion of the project acceptance.
11.3.3    施工企业应对工程资料的管理进行策划,并按规定加以实施。工程资料的形成应与工程进度同步。施工企业就好按规定及时向有关方移交相应资料。归档的工程资料应符合档案管理的规定。
11.3.3 construction enterprises to deal with the engineering data management plan, and shall be implemented. Engineering data formation should be and engineering progress synchronization. Construction enterprise is good in accordance with the provisions of relevant information is transferred to the corresponding. Archiving project information should be consistent with the provisions of the archives management.
11.4  施工质量问题的处理
11.4 construction quality problem processing
11.4.1    施工企业应建立并实施质量问题处理制度,规定对发现质量问题进行有效控制的职责、权限和活动流程。
11.4.1 construction enterprise should establish and implement quality problem processing system, provision of quality problems found effective control duty, authority and activity process.
11.4.2    施工企业应对质量问题的分类、分级报告流程作出规定,按照要求分别报告工程建设有关方。
11.4.2 construction enterprises to deal with the quality issues of classification, grading report stated, in accordance with the requirements of the construction side respectively report.
11.4.3    施工企业应对各类质量问题的处理制定相应措施,经批准后实施,并应对质量问题的处理结果进行检查验收。
11.4.3 construction enterprises to deal with all kinds of quality problems and formulate corresponding measures, the implementation after approval, and deal with the quality problem processing results of inspection and acceptance.
11.4.4    施工企业应保存质量问题的处理和验收记录,建立质量事故责任追究制度。
11.4.4 construction enterprise shall retain the quality problem processing and inspection records, the establishment of quality accident accountability system.