SA8000验厂自然灾害应急管理规定 发布时间: 2011-10-22 21:54 点击:

SA8000验厂自然灾害应急管理规定
SA8000 factory inspection of natural disaster emergency management regulations
1.目的
1 Purpose
当然灾害发生时,有利的保障员工的人身安全,保护公司财产,将可能的损失减少到最低。
Of course, when disasters occur, is conducive to the protection of the personal safety of the staff, to protect property of the company, will be the loss to a minimum.
2.范围
2 range
SA8000验厂自然灾害应急管理规定适用于所有可能对本公司生产、办公的正常进行造成影响的自然灾害。当公司遭遇自然灾害时能有序、有效地处理,将灾害带来损失减至最小。本规定是《应急准备与响应管理程序》的作业文件。
SA8000 factory inspection of natural disaster emergency management provisions apply to all possible pairs of the company's production, office normally caused by the effects of natural disasters. When the company encountered natural disasters can be orderly, effective treatment, will bring disaster to minimize the losses of. The provisions are" emergency preparedness and response management program" job file.
3.职责
Responsibility 3
本规定由政务科规划实施,各部门协调配合。
This regulation by government department of planning implementation, coordination of various departments.
4.管理规定
4 regulations
4.1 自然灾害的预防。
4.1 natural disasters prevention.
4.1.1各部门要树立防灾抗灾的意识,对可能产生的灾害制定可行性措施,并对全体员工进行适当的教育。在设备设施方面政务科要组织保安队、水电组进行采购备用。
4.1.1 departments should establish the awareness of disaster prevention, possible disaster make feasible measures, and to all the staff for proper education. The equipment facilities author to organize security team, water and electricity group procurement of spare.
4.1.2公司建筑物应有抗震、防暴、避雷措施。
4.1.2 company building should be seismic, riot, lightning protection measures.
4.2 自然灾害来临前的准备。
4.2 natural disasters before the onset of the preparation.
4.2.1 将可能到达的灾害通报全厂,讲解相关灾害的保护、自救方法。
4.2.1 will probably reach disaster notification factory, explain relevant disaster protection, self-help method.
4.2.2 对灾害的防范设施进一步检测、加固,对可能受灾严重的地点重点保护。
4.2.2 on disaster prevention facilities further testing, reinforcement, on May the worst-hit sites focus on the protection of.
4.2.3 针对到来的灾害,指定2套以上应急预案,尽量将所有可能发生的意外情况考虑再内,做好应对准备。
4.2.3 for the coming disaster, specify more than 2 sets of emergency plan, try to consider all possible contingencies in, prepare for.
4.2.4 组建灾害应急管理小组。
4.2.4 disaster emergency management team.
4.2.5风暴、台风的应急处理
4.2.5 storm, typhoon emergency treatment
4.2.5.1在风暴、台风发生时不得进行建筑施工,不得安排高空作业,并且在来临之前政务科要通知各部门领导加强本部门人员安全意识;
4.2.5.1 in the storm, typhoon occurs not in building construction, must not arrange work high above the ground, and before the onset of government department to inform the leaders of each department to strengthen the staff safety consciousness;
4.2.5.2对厂区内的高处灯箱、广告牌应立即进行加固或拆除,全方位采取防暴、防风措施;
4.2.5.2 on plant height, light box advertising should undergo immediate reinforcement or removed, all-around riot, windbreak measures taken;
4.2.5.3对可能造成空气中沙尘过多的沙堆,应及时加上保护包装或转移、清除。
4.2.5.3 for possible air dust too much sand, should be timely and protective packaging or transfer, removal.
4.2.6 暴雨、洪水的应急处理
4.2.6 rainstorm, flood emergency treatment
4.2.6.1 对底楼仓库、车间内所有可能受灾的原辅料、产品应盖上油布,做好防水包装或转移;
4.2.6.1 on ground floor warehouse, workshop in all possible victims of the raw materials, products should be covered with tarpaulin, good waterproof packaging or transfer;
4.2.6.2露天堆放的办公、生产用具、木材等应及时盖上油布或转移;
4.2.6.2 open-air piling up of office, production equipment, wood should be covered tarpaulin or transfer;
4.2.6.2对室外堆放的有可能造成水污染的垃圾、废料应及时清除;
4.2.6.2 on outdoor stacking possible water pollution caused by garbage, waste should be cleared in time;
4.2.6.3加固沿厂河堤,疏通厂区下水道,厂区内河道、水池管道疏通,及时排水。
4.2.6.3 reinforcement along the riverbank to dredge the sewer plant, plant, plant area of river, water pipeline dredge, drainage.
4.3 自然灾害来临时的应对。
4.3 natural disasters come to.
4.3.1 灾情时时通报全公司,如情况紧急应停止生产办公,进行抗灾赈灾,并立即电话通知投保之保险公司立案备查,以便采集理赔依据。
4.3.1 disaster always informed throughout the company, such as emergency stop production office, for disaster relief, and immediately call the insurance insurance company filed for reference, according to collecting claims.